PROJECT TITLE: CONSTRUCTION OF AN INTERNAL NETWORK OF DIRTY SCREEN AND CONNECTOR WITH COLLECTOR - HEAT
INITIAL BUDGET: 2,344,969.27 EUROS (INCLUDING VAT)
The Tender was carried out using the platform of the National Electronic Public Procurement System (ESIDIS), through the System's online portal
www. prometheus. gov. gr.The award was made according to the method of the open procedure and with the sole criterion of the most economically advantageous offer based on the price.
OBJECT:
The project constructed is mainly hydraulic and involved the construction of:
- The sewer pipes (collectors and mains) of the internal network of the settlement of Souroti, approximately 7,120.00m long.
- Of the sewage transport pipeline to the point of confluence with the Vasilikon Sewage Treatment Plant, approximately 2,450.00m long.
- The construction of a pumping station in the north-eastern part of the settlement, in order to connect a small part of the pre-existing settlement to the sewage network, and a pusher pipeline of approximately 360.00m in length.