OBJECT:
The project constructed is mainly hydraulic and involved the construction of:
- The sewer pipes (collectors and mains) of the internal network of the settlement of Souroti, approximately 7,120.00m long.
- Of the sewage transport pipeline to the point of confluence with the Vasilikon Sewage Treatment Plant, approximately 2,450.00m long.
- The construction of a pumping station in the north-eastern part of the settlement, in order to connect a small part of the pre-existing settlement to the sewage network, and a pusher pipeline of approximately 360.00m in length.