{"id":3925,"date":"2023-04-13T07:11:13","date_gmt":"2023-04-13T07:11:13","guid":{"rendered":"https:\/\/axionte.gr\/?page_id=3925"},"modified":"2023-05-11T10:31:34","modified_gmt":"2023-05-11T10:31:34","slug":"%ce%ba%ce%b1%cf%84%ce%b1%cf%83%ce%ba%ce%b5%cf%85%ce%ae-%ce%b1%cf%80%ce%bf%cf%87%ce%ad%cf%84%ce%b5%cf%85%cf%83%ce%b7%cf%82-%ce%ba%cf%8d%cf%81%cf%81%ce%bf%cf%85","status":"publish","type":"page","link":"https:\/\/axionte.gr\/en\/%ce%ba%ce%b1%cf%84%ce%b1%cf%83%ce%ba%ce%b5%cf%85%ce%ae-%ce%b1%cf%80%ce%bf%cf%87%ce%ad%cf%84%ce%b5%cf%85%cf%83%ce%b7%cf%82-%ce%ba%cf%8d%cf%81%cf%81%ce%bf%cf%85\/","title":{"rendered":"PROJECT TITLE: CONSTRUCTION OF INTERNAL AND EXTERNAL SEWAGE NETWORKS OF KYRROU MUNICIPAL UNIT"},"content":{"rendered":"<p>PROJECT TITLE: CONSTRUCTION OF INTERNAL AND EXTERNAL SEWAGE NETWORKS OF KYRROU MUNICIPAL UNIT<\/p>\n<p>INITIAL BUDGET: 2,823,722.83 euros (INCLUDING REVISION AND VAT)<\/p>\n<p>SUBJECT: The project was built within the boundaries of the Municipality of Pella, specifically in D.D. New and Old Mill Topos and in the D.D. Axou \u2013 Pontochori.<\/p>\n<p>&nbsp;<\/p>\n<p>The project constructed is mainly hydraulic and involved the construction of:<\/p>\n<ul>\n<li>of a 3.3km long sewage pipeline from N. Mylotopos to EEL.<\/li>\n<li>internal gravity network of dirt in Paleo Mylotopos, with a total length of 6.2km, and transport network to the N. Mylotopos sewage pipeline, which includes a pumping station and depression pipeline of 0.8km length.<\/li>\n<li>internal gravity network of dirt in Pontochori, with a total length of 2.8 km.<\/li>\n<li>of the sewage transport network from Axos and Pontochori to the sewage transport pipeline N. Mylotopou, which includes two pumping stations and a depression pipeline 2.9km long.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>PROJECT TITLE: CONSTRUCTION OF INTERNAL AND EXTERNAL SEWERAGE NETWORKS OF THE MUNICIPALITY OF KYRROS INITIAL BUDGET: 2,823,722.83 euros (WITH REVISION AND VAT) SUBJECT: The project was constructed within the boundaries of the Municipality of Pella and specifically in the Municipal Districts of Neo and Palaio Mylotopos and in the Municipal Districts of Axos - Pontochori. The work that was constructed is mainly hydraulic and concerned the construction of: [\u2026]<\/p>","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-3925","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/pages\/3925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/comments?post=3925"}],"version-history":[{"count":4,"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/pages\/3925\/revisions"}],"predecessor-version":[{"id":3969,"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/pages\/3925\/revisions\/3969"}],"wp:attachment":[{"href":"https:\/\/axionte.gr\/en\/wp-json\/wp\/v2\/media?parent=3925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}