5. FROMGOOD FRIDAY MEETING:
PROJECT TITLE: CONSTRUCTION OF AN INTERNAL NETWORK OF HOLY FRIDAY WASTE AND CONNECTOR WITH COLLECTOR - THERMIS
INITIAL BUDGET: 2,210,846.88 EUROS (INCLUDING VAT)
OBJECT:
The project constructed is mainly hydraulic and involved the construction of:
- The sewer pipes (collectors and main) of the internal network of the settlement of Agia Paraskevi of approximately 6,140.00 m.
- Of the sewage transport pipeline to the point of confluence with the Vassilikos Wastewater Treatment Plant, approximately 1,660.00m long.
- The construction of a pumping station in the north-western part of the settlement, in order to connect the residential areas located west and south-west of the existing settlement and a push pipeline of approximately 320.00m to the sewage network
The company successfully constructed the construction of the sewage pipelines (collectors and main) of the internal network of the settlement and the sewage transport pipeline up to the consulting position at the Vasilikon Wastewater Treatment Plant, with the final recipient being the new sewage treatment facility of the Municipality of Thermi. In addition, the construction of a pumping station in the North-Eastern part of the settlement is planned, in order to connect a small part of the pre-existing settlement and the expansion area of the city plan to the east with the sewage network.