8. ROOT DRAINAGE:
PROJECT TITLE: CONSTRUCTION OF A SEWERAGE NETWORK IN T.K. RIZOU AND CONNECTION WITH THE SKYDRAS BIOLOGICAL STATION
INITIAL BUDGET: 3,850,806.45 (REVISED WITHOUT VAT) + 305,477.24 EURO SUPPLEMENTARY CONTRACT (WITH REVISED AND VAT)
OBJECT:
The project concerns the construction of an internal network of T.K. Rizou with a total length of 12,890.54 meters and the construction of private connections from the properties, the construction of pipelines for transporting the waste water of the Postal Codes. Petrias Arseniou and the settlement of Pleroma with a total length of 7,214.70 meters and an external connection network of T.K. Rizou (with provision for service networks of T.K. Arsenio, T.K. Petria and Pleroma settlement) with a total length of 5,034.36 meters

